Dragline Simulation

The Dragline Simulator first developed in 1981 has evolved over the last 33 years. Filling the need for an effective cross-section planning tool, the Dragline Simulator has solved mining issues in the most complex operations in Australia. The Dragline Simulator incorporates powerful blasting analysis and simulation. Using a parametric approach to blast definition ensures accurate and fast blast simulation. Dump constraint planning is fast and effective due to innovative 2.5D modelling. Planning with the Dragline Simulator reduces planning time and empowers the engineer. It provides a superior result by examining many options.



Features